All features / Build Progress
Document construction progress over time.
Keep Before, Progress, and After evidence connected inside the same work record.

The field problem
Separate progress photos make it difficult to see how the same work changed. Build Progress connects the stages rather than treating them as unrelated images.
How it works
Before → Progress → After
- Record the condition Before work.
- Add Progress evidence as physical work changes.
- Document the After condition and review the sequence.
What stays connected
Before, Progress, and After photos stay connected with their stage notes in one work record.
Typical field use
Follow a renovation, installation, repair, or maintenance job from the starting condition to the finished work.
Result
A connected account of physical progress for review and reporting. This is not scheduling, task management, or percentage-complete tracking.
Next in the workflow