All features / Build Progress

Document construction progress over time.

Keep Before, Progress, and After evidence connected inside the same work record.

ProofLog product screenshot: Build Progress
Product screenshot shown in English.

The field problem

Separate progress photos make it difficult to see how the same work changed. Build Progress connects the stages rather than treating them as unrelated images.

How it works

Before → Progress → After

  1. Record the condition Before work.
  2. Add Progress evidence as physical work changes.
  3. Document the After condition and review the sequence.

What stays connected

Before, Progress, and After photos stay connected with their stage notes in one work record.

Typical field use

Follow a renovation, installation, repair, or maintenance job from the starting condition to the finished work.

Result

A connected account of physical progress for review and reporting. This is not scheduling, task management, or percentage-complete tracking.

Next in the workflow

Review the evidence together.

Evidence Gallery →